TenCate Solutions
- New lakes in Czech Republic with TenCate geosynthetics
- Landscaping project in Gaziantep (Turkey)
- TigerTurf goes the distance
- TenCate Defender™ M in FR-ACU and FROG
- Synthetic turf for 5-a-side pitches
- Composites for innovation in mobility
- TenCate Mirafi® RS580i for a durable subgrade
- TenCate prepreg systems for Orion
- Dewatering projects in Rio de Janeiro
- TenCate Tecasystem™ - new protective solutions
- TenCate Geotube® technology for dewatering
- Dewatering project in Almeirim (Portugal)
- TenCate Geotube® in Korea awarded
- Runway extension airport Ain Arnat
- Avalanche protection Innsbruck
- Carbon laminates for Airbus A350 XWB
- TenCate Liba® stands the test
- Monitoring and warning system
- Rehabilitating and protecting coastline of Grand Isle
- Multi-layer protection on the job
- TenCate Campshield™ for group tents
- Geosynthetics in the Volgermeerpolder
- Dewatering of contaminated sediments
- Safe waste storage Laogang
- Bank restoration industrial terrain
- Geosynthetics for a green appearance
- Developments in synthetic turf systems
- Retaining wall with element of green
- Composites in climate-neutral vehicle
- Composites for UltraLight Glider
- Solar Team Twente 2009
- Solar Team Twente 2007
- Solar Team Twente 2005
- KG-1 Concept
- Go-4 Dakar
- DUT Racing Team
- Superbus Concept
Safe storage of waste Shanghai
Shanghai is one of four municipalities in China with a status equivalent to that of a province. The municipality of Shanghai has a total area of 6,340 km ² (30 x Amsterdam) and a population of about 23 million (density per 3,270 km ²). This makes Shanghai in terms of population the largest city in the world. It is also the largest economic center of China.
Such a city produces annually more than 10 million tons of municipal waste, two-thirds by industry and one third of households. Part of the waste is recycled, another disappears into landfills. One is located in Laogang (Nanhui District), about 60 km from downtown Shanghai. The landfill is located near the shore, covers 360 hectares and has a landfill capacity of more than 34 million tons of waste. Every day 6300 tons of waste are deposited. Such a landfill must meet international standards and local Chinese regulations. Problem: the soft clay bottom. Therefore, the base features a special lining with two qualities TenCate Mirafi® filter fabric.

A first stabilizing layer TenCate Mirafi® rests on the soft soil. Interfacing includes, among other geomembranes and drainage nonwovens. These are covered with a lighter quality TenCate Mirafi® filter fabric.
