TenCate Solutions
- New lakes in Czech Republic with TenCate geosynthetics
- Landscaping project in Gaziantep (Turkey)
- TigerTurf goes the distance
- TenCate Defender™ M in FR-ACU and FROG
- Synthetic turf for 5-a-side pitches
- Composites for innovation in mobility
- TenCate Mirafi® RS580i for a durable subgrade
- TenCate prepreg systems for Orion
- Dewatering projects in Rio de Janeiro
- TenCate Tecasystem™ - new protective solutions
- TenCate Geotube® technology for dewatering
- Dewatering project in Almeirim (Portugal)
- TenCate Geotube® in Korea awarded
- Runway extension airport Ain Arnat
- Avalanche protection Innsbruck
- Carbon laminates for Airbus A350 XWB
- TenCate Liba® stands the test
- Monitoring and warning system
- Rehabilitating and protecting coastline of Grand Isle
- Multi-layer protection on the job
- TenCate Campshield™ for group tents
- Geosynthetics in the Volgermeerpolder
- Dewatering of contaminated sediments
- Safe waste storage Laogang
- Bank restoration industrial terrain
- Geosynthetics for a green appearance
- Developments in synthetic turf systems
- Retaining wall with element of green
- Composites in climate-neutral vehicle
- Composites for UltraLight Glider
- Solar Team Twente 2009
- Solar Team Twente 2007
- Solar Team Twente 2005
- KG-1 Concept
- Go-4 Dakar
- DUT Racing Team
- Superbus Concept
TenCate Geotube® in Korea awarded
In October 2010 TenCate Geosynthetics USA won an Award of Excellence in the 2010 International Achievement Award (IAA) for the Incheon Bridge project in South Korea, in which TenCate Geotube® technology was used.

The Incheon Bridge (October 2009) near the South Korean city of Incheon is a cable-stayed bridge. An artificial island had to be created to provide a construction platform for building this cable bridge. First filter mats were laid at low tide, and then the TenCate Geotube® systems were installed. Under the circumstances it was the most cost-effective and time-efficient method. The installation of TenCate Geotube® systems began at the end of end April 2006 and was completed in December of the same year. In total 18,000 metres of TenCate Geotube® were supplied.

The island on which the bridge rests has now been wholly incorporated into a land reclamation area. Scooping this project has been a contributory factor in further strengthening TenCate Geosynthetics’ leading market position in Asia.
On behalf of TenCate Geosynthetics, Tack Weng Yee, Edwin Zengerink and Jong Choi, TenCate Geosynthetics’ agent in South Korea were involved in the project. Tack Weng Yee: ‘In Asia, as TenCate Geosynthetics, we are concentrating on offering the customer system solutions instead of just materials'. This is entirely in line with the strategy of TenCate Geosynthetics: from the product information stage to the development and delivery of complete solutions.
Rodney Cheah (TenCate Geosynthetics Asia) and Choi Jong Chul (TenCate distributor in Korea).
